RAB WFRL4R99FA120WBS 4 Inch Shallow Edge-Lit Wafer Downlight – 9W – 5-CCT Selectable – White Baffle Trim – CRI90 – 120V – 750 Lumens

RAB WFRL4R99FA120WBS 4 Inch Shallow Edge-Lit Wafer Downlight – 9W – 5-CCT Selectable – White Baffle Trim – CRI90 – 120V – 750 Lumens

$20.00
Sale price  $20.00 Regular price 
Skip to product information
RAB WFRL4R99FA120WBS 4 Inch Shallow Edge-Lit Wafer Downlight – 9W – 5-CCT Selectable – White Baffle Trim – CRI90 – 120V – 750 Lumens

Product: RAB WFRL4R99FA120WBS 4 Inch Shallow Edge-Lit Wafer Downlight – 9W – 5-CCT Selectable – White Baffle Trim – CRI90 – 120V – 750 Lumens

UL Certified California Title 24 Compliant Energy Star Certified CCT Adjustable No Housing Required TRIAC + ELV Dimmable Wet Location Rated 90+ CRI 120V 50000 Rated Hours

Description

The RAB Lighting WFRL4R99FA120WBS 4-inch shallow edge-lit wafer downlight features a 9W LED with selectable five color temperatures. It delivers 750 lumens, operates on 120V power, provides 90 CRI, and features a white baffle trim.

Specifications

  • Vendor: RAB Lighting
  • MPN: WFRL4R99FA120WBS
  • UPC: 192552024266
  • Product Type: Wafer Recessed Light
  • Size: 4in
  • Wattage: 9W
  • Input Voltage: 120V
  • Lumens: 750
  • CCT: 2700K, 3000K, 3500K, 4000K, 5000K
  • CRI: 90+
  • Equivalent: 60W Incandescent
  • Beam Angle: 110°
  • Dimming: TRIAC/ELV
  • Features: CCT Selectable
  • Certifications: UL, Energy Star, Title 24
  • Location Rating: Wet
  • Mounting Type: Recessed
  • Product Shape: Round
  • Trim Style: Smooth
  • Lens: Polycarbonate
  • Operating Temperature: -4°F to 104°F (-20°C to 40°C)
  • Weight: 0.8 lbs
  • Finish: White
  • Dimensions: 4.75"D x 0.5"H
  • Rated Hours: 50000
  • Warranty: 5 Years
  • Applications: Offices, Hotels, Multifamily Housing, Residential Homes, Retail Spaces
$20.00
Sale price  $20.00 Regular price 
In Stock
Free Standard Shipping: Available on all RAB Lighting products.
Lead Time: 1–3 Business Days

Payment & Security

American Express Apple Pay Discover Google Pay Mastercard PayPal Shop Pay Visa

Trusted by contractors, businesses, and facility managers since 1996.

Project Support & Volume Pricing

Need help choosing the right product or pricing a larger order? Our team can assist with specifications, compatibility, fixture schedules, controls packages, contractor pricing, and bulk quantity quotes.

Shipping

Fast and reliable shipping from leading commercial lighting manufacturers. Shipping rates and delivery options are calculated at checkout. Most in-stock products ship within 1–3 business days.


View Shipping Policy →

Return policy

Purchase with confidence. Eligible products may be returned within 60 days of receipt. Our team is available to assist with returns, replacements, and manufacturer warranty support.


View Return Policy →

Related products

Need Help Choosing?

Get Help Selecting This Wafer Recessed Light

Have questions about the RAB Lighting WFRL4R99FA120WBS Wafer Recessed Light? Our commercial lighting specialists can help verify specifications, compatibility, availability, installation requirements, and suitability for your lighting project.

Visit our Knoxville headquarters or contact our team for expert assistance. Commercial Lighting Supply has proudly served contractors, facility managers, electricians, businesses, and property owners since 1996 while shipping commercial lighting products nationwide.

Address:
1485 Amherst Road
Knoxville, TN 37909

Phone:
(865) 558-0080

Email:
sales@commercialltg.com

Store Hours

Monday – Friday: 7:30 AM – 4:30 PM
Saturday: Closed
Sunday: Closed

Serving Customers Nationwide Since 1996
Commercial Lighting Specialists
Knoxville Headquarters & Sales Counter